| |
|
|
|
|
Middlemount Mine
Client: Middlemount Coal Pty Ltd
Construction of the entire Mine Industrial Area including a drive through six bay maintenance workshop suitable for CAT 797 ultra class trucks. The workshop has a 40m clear span with a 25 tonne overhead crane.
|
 |
Gateway Bridge Upgrade Project
Client: Leighton Abigroup Joint Venture
Site Establishment. Supply of labour to Precast yard and Main Bridge
|
 |
Clem 7 Tunnel
Client: Leighton Bilfinger Burger Joint Venture
Finishing work to main tunnel.
|
 |
Moorvale Mine
Client: Macarthur Coal
Design & Construction of a maintenance workshop suitable for CAT 793 trucks including a 20 tonne overhead crane. We also upgraded the light and heavy vehicle wash facility.
|
 |
Coppabella Mine
Client: Macarthur Coal
Design & Construction of a 9 bay maintenance workshop suitable for CAT 793 trucks including a 20 tonne overhead crane. We also designed & built the light and heavy vehicle wash facility, the stores facility, including pallet racking, and manufactured and installed the maintenance administration block and ablution area. Alterations and improvements were made to the Fuel Farm facility.
|
 |
Poitrel Mine
Client: Leighton Contractors / BMA
Design & Construction of MIA including Maintenance Workshop, Wash Down Facility, Refuelling Slab & Office Complex.
|
 |
|
|
|
|
|
|
|